Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the aheto domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tarteaucitronjs domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the better-wp-security domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114
Rénovation, extension et mise aux normes de l'école primaire Marcel Pagnol - Lugny - ARCH:ethik
ARCH:ethik

Rénovation, extension et mise aux normes de l'école primaire Marcel Pagnol - Lugny

Le site environnant l’école est caractérisé au Nord, au Sud et à l’Est, par un bâti traditionnel ancien assez dense, constitué de logements, commerces et lieux d’activité publics diverses, typiques des coeurs de village de nos régions.

Le projet est constitué de trois extensions différentes, conçues dans le respect de ce bâti traditionnel :
- la plus importante se situe au Sud de l’école maternelle, vers l’entrée de l’école élémentaire. Cette extension, de composition contemporaine et prolongée par un préau, permet de retravailler l’entrée principale de l’école élémentaire et les bâtiments construits plus récemment. Le bardage vient isoler et habiller l’ensemble de manière homogène, et se marie parfaitement avec les bâtiments en pierre plus anciens, tout en traduisant la destination de l’établissement.
- une deuxième extension implantée dans la cour de l’école maternelle prend la forme d’une galerie, permettant de traiter l’accessibilité aux personnes à mobilité réduite. L’ensemble des bâtiments de l’école, tous à des niveaux différents, est ainsi rendu accessible par des jeux de rampes extérieures et intérieures. Un préau vient également se développer dans le prolongement de la galerie.
- enfin, la troisième extension située à l’Ouest en prolongement du bâtiment central, permet la création d’un bureau et d’un local de nettoyage.

Le projet a pour ambition de redonner une meilleure lisibilité quant à l’entrée principale de l’école et d’améliorer la fonctionnalité et le confort de l’ensemble.
La galerie se prolonge à l’intérieur par une percée du bâtiment existant, rejoignant le hall d’entrée créé pour l’école élémentaire. Cette ligne de dégagement devient une véritable colonne vertébrale, qui distribue tous les espaces et redonne une cohérence à l’ensemble des bâtiments construits au fur et à mesure du temps.

Maître d'Ouvrage

Commune de Lugny

Surface

550m²

Livraison

2018

Matériaux
Catégorie

Enseignement

Montant des Travaux

650 000.00€