Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the aheto domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tarteaucitronjs domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the better-wp-security domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/archete/www/wp-includes/functions.php on line 6114
Construction d'une Micro-Crèche et d'un Relais d'Assistants Maternels - Mionnay - ARCH:ethik
ARCH:ethik

Construction d'une Micro-Crèche et d'un Relais d'Assistants Maternels - Mionnay

Construction d’une micro-crèche (Tranche 1) et d’un RAM (Tranche 2)

Située au centre de la commune de Mionnay, la micro-crèche effectuée en 1ère tranche occupe la partie nord est d’un terrain de 1790 m2.
La position du bâtiment sur le terrain a été pensée pour permettre une extension future de celui-ci. Au départ composé d’une salle d’éveil pour les enfants, de deux petits dortoirs, d’une salle de propreté, d’une zone accueil/bureau et de locaux techniques, l’ensemble à été conçu d’emblée pour pouvoir accueillir un Relai d’Assistantes Maternelles et des salles d’éveil supplémentaires pour que les petits, moyens et grands aient chacun leur espace. Cette extension effectuée en deuxième tranche porte la capacité d’accueil à 24 berceaux plus un multi-accueil intégrant le RAM.
Le traitement des ouvertures en façades par des bow-windows en tôles métalliques colorées a pour but de proposer à la vue des usagers de la crèche un aspect ludique. D’autre part, les bow-windows amènent de la lumière à l’intérieur du bâtiment et un espace «habitable» supplémentaire. Les enfants ont aussi une vue sur l’extérieur du fait de la position en partie basse de ces ouvertures. L’entrée a été conçue pour offrir une transition douce, colorée et fonctionnelle entre la zone publique et privée. Cela se matérialise par un «pare-vue» semi ajouré et traité en polycarbonate coloré fixé sur une structure métallique.

Maître d'Ouvrage

Communauté de Communes de la Dombes

Catégorie

Petite Enfance

Surface

257m²

Montant des Travaux

650 000€ HT

Livraison

2018